Tabel matriks instalasi harian per cluster, format setara spreadsheet resmi proyek.

Filter Cluster:
Scope:
ClusterHPScopeItem PekerjaanSatuan31-Oct-261-Nov-262-Nov-263-Nov-264-Nov-265-Nov-266-Nov-267-Nov-268-Nov-269-Nov-2610-Nov-2611-Nov-2612-Nov-2613-Nov-26TOTALBOQSISAPROG %STATUS FINAL
JIMBUNGCLR (70%)Pole 7m "3"Btg--------------064640%
CLR (70%)Pole 7m "2.5"Btg--------------078780%
CLR (70%)Pole 7m "4"Btg--------------0220%
CLR (70%)Pole 9m "4"Btg--------------0000%
CLR (70%)Kabel 24cMeter--------------01,3481,3480%
CLR (70%)Kabel 36cMeter--------------0000%
CLR (70%)Kabel 48cMeter--------------04,2844,2840%
CLR (70%)FATUnit--------------042420%
CLR (70%)FDT 1(72) 2( 48)Unit--------------0220%
CLR (70%)Aksesoris & Perapihan ClusterMeter--------------0000%
SF (30%)Tiang Feeder (Pole SF)Btg--------------0000%
SF (30%)Kabel Feeder (Cable SF)Meter--------------0000%
SF (30%)Aksesoris & Perapihan SubfeederMeter--------------0000%
SF (30%)Joint Closure (JC)Unit--------------0000%